The operation steps of the pulverizer :
1. After unpacking, first check whether the equipment is damaged in transit, then put the high-machine and auxiliary electrical control devices in place, and then connect the main and auxiliary machine's pipe roads. The seal is painted with “iron anchor 609†liquid sealant to ensure the tightness of the pipeline. At the same time, each single machine and pipe flange are connected by grounding wire and grounded to avoid dust explosion caused by static spark.
2. Before each single machine is tested, it is necessary to check whether there are metal objects in the machine, and if it is, remove it. Whether the bolt is firm, the tightness of the belt, the reliability of the shield, etc.
3. Start each motor in the following order, close the damper start, pulverizer -> dust collector -> grading device -> screw feeder -> open damper -> air damper.
4. After five minutes of empty car operation, the operator should carefully observe the various instruments on the control cabinet, and wait until the no-load current is stable before feeding. After the feeding, the current is not allowed to exceed the rated value of 32.6A. Otherwise, the amount should be reduced to ensure that the normal operation of the discharge electric can work regularly.
5, can be stopped in the following order: screw feeder -> run five minutes after the same can be crushed host, dust collector, classifier -> air lock.
6. Operate the stepless shifting handle of the classifier to change the speed of the classifying wheel and at the same time achieve the fine adjustment of the product. If the product size is required to be fine, the rotation speed can be increased, and vice versa, the particle size can be increased.
1. After starting, when the standby device reaches normal operation, it is allowed to feed the crop evenly and continuously.
2. Pay attention to the motor, the speed of the thresher, the sound and the temperature of the bearing.
3. When feeding, the operator should stand on the side of the feeding port. The sleeves of the clothes should be tight, and the mask and work cap should be worn.
4. When feeding, pay attention to whether the grain has hard objects such as stones, trowels, tool screws, etc., so as not to damage the machine and cause accidents.
5, the machine does not allow to hang the belt, oil injection, cleaning and troubleshooting.
6, found the following problems should be shut down the engine, shutdown processing, 1 motor smoke, 2 blocked, 3 crush quality is not good, 4 bearings overheated, more than 60 degrees.
1. After unpacking, first check whether the equipment is damaged in transit, then put the high-machine and auxiliary electrical control devices in place, and then connect the main and auxiliary machine's pipe roads. The seal is painted with “iron anchor 609†liquid sealant to ensure the tightness of the pipeline. At the same time, each single machine and pipe flange are connected by grounding wire and grounded to avoid dust explosion caused by static spark.
2. Before each single machine is tested, it is necessary to check whether there are metal objects in the machine, and if it is, remove it. Whether the bolt is firm, the tightness of the belt, the reliability of the shield, etc.
3. Start each motor in the following order, close the damper start, pulverizer -> dust collector -> grading device -> screw feeder -> open damper -> air damper.
4. After five minutes of empty car operation, the operator should carefully observe the various instruments on the control cabinet, and wait until the no-load current is stable before feeding. After the feeding, the current is not allowed to exceed the rated value of 32.6A. Otherwise, the amount should be reduced to ensure that the normal operation of the discharge electric can work regularly.
5, can be stopped in the following order: screw feeder -> run five minutes after the same can be crushed host, dust collector, classifier -> air lock.
6. Operate the stepless shifting handle of the classifier to change the speed of the classifying wheel and at the same time achieve the fine adjustment of the product. If the product size is required to be fine, the rotation speed can be increased, and vice versa, the particle size can be increased.
1. After starting, when the standby device reaches normal operation, it is allowed to feed the crop evenly and continuously.
2. Pay attention to the motor, the speed of the thresher, the sound and the temperature of the bearing.
3. When feeding, the operator should stand on the side of the feeding port. The sleeves of the clothes should be tight, and the mask and work cap should be worn.
4. When feeding, pay attention to whether the grain has hard objects such as stones, trowels, tool screws, etc., so as not to damage the machine and cause accidents.
5, the machine does not allow to hang the belt, oil injection, cleaning and troubleshooting.
6, found the following problems should be shut down the engine, shutdown processing, 1 motor smoke, 2 blocked, 3 crush quality is not good, 4 bearings overheated, more than 60 degrees.
Salmon Pet Food,Salmon Pet Snacks,Freeze Dried Petfood,Freeze Dried Salmon Pet Food
Ningbo Nutrition Food Technology Co.,ltd. , https://www.collagenworkshop.com