1. The customer wrapped the green head of the instrument with the raw material belt, and installed it in the water inlet “SUPPLY†and the water return “RETURNâ€.
2. Connect the supporting equipment that customers need to cool down: connect the water outlet “SUPPLY†of the chiller to the water inlet of the customer accessory equipment, and connect the “RETURN†of the chiller back to the water outlet of the customer accessory equipment.
3. Add water: add water to the submerged coil, about 2cm away from the water tank. If the target temperature (SV) is less than 5 degrees, the medium in the tank is replaced by alcohol or ethylene glycol.
4. After adding water, plug in the power supply, turn on the chiller, let it circulate until there is no air in the pipeline. If the medium in the tank becomes less, raise it in time.
5. This way you can open the customer's equipment and experiment with it.
Medical Patch And Gel,Pain Patch,Pain Relief Patch,Icy Hot Back Patch
Shandong Zhushi Pharmaceutical Group Co.,LTD , https://www.sdzs-medical.com